Branch
Exchange B
The branch keeps a works ledger in which each renovation is entered with its start and its finish. The two dates have never been the same day. The longest job so far ran from 2907 until the crew came back for their tools.
The stone trough by the gate was built for horses, and no horse has been stabled at Exchange B since 2907. Shuttles drink from it on the way in. The yard book records it as a watering point at the rate for a horse, which the drivers pay without remark.
Opening hours
| Counter | Local (watch) | Standard |
|---|---|---|
| Counter | 0.35 to 0.64 of the watch | 02:19:12 a watch |
| Memory Vault | 0.35 to 0.56 of the watch | 01:40:48 a watch |
| Automated Temporal Machines | Every watch | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Dagny Halloran | Branch Manager | d.halloran6496@bankoftime.net |
| Ivo Grisolm-Kowalczyk | Accounts Officer | i.grisolmkowalczyk8461@bankoftime.net |
| Nadia Achterberg | Slippage Reconciliation Clerk | n.achterberg5971@bankoftime.net |
| Elif Ishikawa-Blue | Customer Relations | e.ishikawablue6756@bankoftime.net |
| Ama Yardley-Zelenko | Pensions Officer | a.yardleyzelenko1748@bankoftime.net |
Getting here
Look for the blue lamp above the Herschel Anchorage 10 dry dock. Exchange B is the door below it, reached by a short ramp built for a cart that never came.
What we offer here
- Lobby flowers donated by a Ceres greenhouse, changed weekly
- Bellows and wicks for the counter lamps, lent against a deposit of one minute
- Clock-face repainting, numerals copied from the first face in the strongroom
- Relaying of a holiday greeting to the Head Office, by wire, on the day it is due
Notices
The warm blinds go down at Exchange B from the first hot watch, and the desk lamp moves to the north side of the counter. The change is announced by the tellers rolling their sleeves one turn, and not by the calendar, which has been known to disagree.
The paint on the stair rail at Herschel Anchorage 10 will be dry on the watch. The old coat, on since 2907, was kept as a sample and is now in the lower office, where it is consulted before any decision about the rail is made.
Ref. CIBT-3029-80C4-9
