Branch
Spur H
Hours at Spur H are counted by the cups of tea the first teller drinks at the window. The cup is small and the tea weak, so the hour runs long in the cold season and short in the warm.
The roof at Biela Anchorage 4 is slate on the north side and tile on the south. Two builders laid the halves and each claimed the ridge, and the ridge is lead, which was there before either of them.
Opening hours
| Counter | Local (shift) | Standard |
|---|---|---|
| Counter | 0.38 to 0.67 of the shift | 02:36:36 a shift |
| Memory Vault | 0.38 to 0.59 of the shift | 01:53:24 a shift |
| Automated Temporal Machines | Every shift | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Greta Fairbrass | Branch Manager | g.fairbrass5302@bankoftime.net |
| Ivo Cardew | Deputy Branch Manager | i.cardew1678@bankoftime.net |
| Pax Drummond | Head Teller | p.drummond8087@bankoftime.net |
| Lumi Halloran | Slippage Reconciliation Clerk | l.halloran9253@bankoftime.net |
| Anouk Delacroix-Mbeki | Chrono-Forex Dealer | a.delacroixmbeki0310@bankoftime.net |
| Folke Kowalczyk-Nakashima | Customer Relations | f.kowalczyknakashima1952@bankoftime.net |
Getting here
The founder's clock is set into the wall outside Biela Anchorage 4 station, and Spur H is the door the founder used while the clock was still running; the door is marked, but not for you.
Services
- Quoits on the portico, provided for holders kept waiting past noon
- Cards of thanks for custodians, printed with the branch's name left blank
- Holiday closure notices, posted a week ahead and read aloud at the counter
- Hearings for disputed slippage under a second, heard in order of arrival
Notices
Night safe tokens are being reissued in brass. Tokens already held will be honoured until the first local shift of the new year, and no later.
The board by the door will be repainted on the shift of the holiday, when the counter is shut in any case, so the hours will read as they did last year until the paint is dry. Depositors may check them from the step, where a chalk line has been set to show the first lamp.
Work on the strongroom door at Spur H begins on the first shift of the month. The door will stay on its hinges and the hinges will be oiled, and a depositor who needs the strongroom in that period may be shown the wall instead.
Ref. CIBT-3029-F807-5
