Branch
Gate H

A depositor who wants an hour of the local day in Standard time may ask for it at the counter. The teller writes it on a slip, which is valid until the next counter hour and no longer.
A depositor who stays past the close at Tempel Yard 11 will hear the local day begin again from the first bell, in the same order as before. The Bank does not charge for the repeat, though it expects the depositor to have left by the third.
Opening hours
| Counter | Local (turn) | Standard |
|---|---|---|
| Counter | 0.36 to 0.65 of the turn | 03:18:10 a turn |
| Memory Vault | 0.36 to 0.57 of the turn | 02:23:30 a turn |
| Automated Temporal Machines | Every turn | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Lio Larkspur | Branch Manager | l.larkspur3099@bankoftime.net |
| Bram Jaramillo-Prendergast | Claims Assessor | b.jaramilloprendergast9552@bankoftime.net |
| Dario Quaresma | Customer Relations | d.quaresma3036@bankoftime.net |
| Nadia Juvonen | Claims Assessor | n.juvonen3871@bankoftime.net |
| Uma Oyelaran | Customer Relations | u.oyelaran6200@bankoftime.net |
| Mara Blackwood | Accounts Officer | m.blackwood0451@bankoftime.net |
This month
- 5 November: Holders are invited to a sunset tea on the Gate H roof, where the custodian will read the day's balance aloud to the gulls, who have never once objected.
- 12 November: The Tempel Yard 11 piano tuner will spend the morning bringing the Gate H counter bell up to the reference pitch, and will report that the bell would prefer to stay flat.
There is a door at the back of Gate H that opens onto a corridor of exactly the length I remember from my childhood. The custodian says the building was rebuilt last year, which gave me no comfort at all.
From the visitors' book, D. N., Nairobi Sector
Lost property
Items are held at the counter for one Standard year and then passed to the Head Office. Bring the ticket number.
| Item | Found | Ticket |
|---|---|---|
| Carpenter's pencil and a plumb line, wrapped in a plan of the lobby as it was before the lobby was built | 23 Sep | LP-9561 |
| Ring of clock keys, each stamped with a different branch code, none with a winding square that fits the same movement | 16 Oct | LP-3527 |
| Pair of pointe shoes, the satin scuffed on one toe as if danced on iron steps | 6 Nov | LP-9112 |
| Trombone slide with forty-two pennies pressed into the bell, all of one reign | 4 Sep | LP-1011 |
| A railway porter's whistle, still warm, on a chain tagged for the strongroom door | 13 Nov | LP-4274 |
Notices
The skirting boards along the north wall of the upper hall are being refitted to hide the damp line. The damp line will be painted over and not removed, since it has been on the plans since 2498 as a feature of the room.
Ref. CIBT-3029-E26C-6