Montréal Sector19:29:18
Mars StationSol 410,894 09:52:42
The Belt8.78.10
Titan AnnexBeat 371.86
Corporate InstitutionalBank of Time0001
A space elevator's base station, a cable rising into the clouds

Locations & ATMs › Gate E, Oort Platform 7

Branch

Gate E

Location
Oort Platform 7
Branch code
3708
Opened
2797
A space elevator's base station, a cable rising into the clouds
Plate I A space elevator's base station, a cable rising into the clouds. From the Bank's archive.

In the warm season the counter cloth comes off and the bare table is wiped with a damp rag at each hour. Depositors may lean on the table, which was not built for leaning, and the teller on duty will say so in the same tone as the rest of the counter.

The building at Oort Platform 7 is numbered from the back to the front, so the first door a depositor reaches is the twelfth. The staff have never been able to explain the numbering, and no depositor has yet asked for the first.

Opening hours

CounterLocal (turn)Standard
Counter0.33 to 0.62 of the turn03:18:10 a turn
Memory Vault0.33 to 0.54 of the turn02:23:30 a turn
Automated Temporal MachinesEvery turnAlways

Branch staff

NameRoleWrite to
Calla Quigley-YeboahBranch Managerc.quigleyyeboah2696@bankoftime.net
Kofi ValderramaMemory Vault Custodiank.valderrama7767@bankoftime.net
Hamid RasmussenSenior Accounts Officerh.rasmussen4194@bankoftime.net
Soren Quaresma-KowalczykBranch Managers.quaresmakowalczyk9956@bankoftime.net
Folke ValderramaMemory Vault Custodianf.valderrama0313@bankoftime.net
Isolde AshgroveClaims Assessori.ashgrove5094@bankoftime.net

This month

  • 4 November: The vestibule clock at Gate E, which strikes the hour of each visitor's birth in turn, will strike the clerks' own hours on Quarter Day, and the custodian will ask nobody to count.
  • 8 November: The Oort Platform 7 clock that keeps a different second from the Head Office will be taken down for a week so the clerks can see why it is not wrong, at the request of a depositor who said it was looking at her.
  • 15 November: The Gate E staff will read out the deposit rules in the hall at the pace of a slow clock, and anyone who finishes a sentence before the bell will be given the day's interest.

History

YearEvent
2797The branch opens.
2799The lobby of Gate E was stripped back to its founding plaster during the refit, and the masons found a plaque beneath with a founding date that no clerk on the staff could read.
2855A single pressed flower came through the Gate E letterbox every seventh day for a century, always from a garden the Ceres survey had not charted, and the flowers are kept in the ledger room in order.
2883A wall clock in the Oort Platform 7 reading room kept Titan hours for a decade after the station changed its day, and when the custodians were asked to correct it, they said it was keeping the hours the depositors had been promised.
2889Someone pinned a square of grey felt to the Gate E ledger shelf each morning for a winter, always with the same stitch, and the custodian who removed it found the next one already in place.
2986The sea wall at Oort Platform 7 gave way in an autumn storm, and the Gate E lost its lower archive to brine, then recovered it by freezing the boxes on the Authority's cold train and thawing them one line a day.

Lost property

Items are held at the counter for one Standard year and then passed to the Head Office. Bring the ticket number.

ItemFoundTicket
Grey felt hat with a band from a Ganymede rail company10 SepLP-1147
Jointed carapace plate from a Positive Contact client, three fingers wide, warm and faintly humming16 SepLP-8745
Receipt for one afternoon's deposit, signed with a thumbprint that matches no one on the staff4 SepLP-2203
Plasterer's trowel with a dried cement handprint on the blade, the hand a child's and the print dated before the wall was built1 SepLP-8124
Reed from a bassoon with no bassoon, tied to a card reading "replaced at the next choir's request"21 SepLP-8753
Typed card reading "Staff face the door at all times", unrevoked, pinned inside a coat26 SepLP-0369

At this branch

  • Lessons in reading an old ledger hand, for holders who wish to check an entry
  • Dust sheets for the strongroom stair, lifted on request during repairs
  • Collection of sealed parcels addressed to the strongroom itself
  • Ash-sealing of ledgers burned in the cellar, certified by a clerk who was present
  • Padlock sold with its key, for objects that will not lie in a drawer

Notices

Lodgements dated to the local day at Oort Platform 7 will be accepted until the board has been wiped or the last depositor has gone, whichever is later. The staff regard this as the fairer of the two.

Light-speed shuttles should not be left on the ramp while the crew rests. The ramp is not a berth, and the Bank has been asked to say so by the station at Ceres as well as by its own staff.

Ref. CIBT-3029-1CC1-8