Montréal Sector19:16:54
Mars StationSol 410,894 09:40:39
The Belt8.55.32
Titan AnnexBeat 371.32
Corporate InstitutionalBank of Time0001
A bank kiosk on a station promenade, the curved floor rising away

Locations & ATMs › Quay G, Pallas Platform 8

Branch

Quay G

Location
Pallas Platform 8
Branch code
4656
Opened
2403
A bank kiosk on a station promenade, the curved floor rising away
Plate I A bank kiosk on a station promenade, the curved floor rising away. From the Bank's archive.

Shuttle crews are given a numbered clip for the windscreen on arrival and return it at departure. A crew that drives off without returning the clip is still counted as parked, however far down the road it has got, until the clip is posted back.

The roof is slate from the first quarry, which closed in 2403. Each replacement is cut from the quarry's last block, which the masons say is still sound and will remain so until it is used.

Opening hours

CounterLocal (watch)Standard
Counter0.38 to 0.67 of the watch02:19:12 a watch
Memory Vault0.38 to 0.59 of the watch01:40:48 a watch
Automated Temporal MachinesEvery watchAlways

Branch staff

NameRoleWrite to
Tamsin MarchettiBranch Managert.marchetti9966@bankoftime.net
Caio XiomaraEvent II Liaisonc.xiomara8138@bankoftime.net
Yusra FothergillClaims Assessory.fothergill2507@bankoftime.net
Cleo ZamoraEvent II Liaisonc.zamora7863@bankoftime.net

Services

  • Stair lift to the strongroom, working on alternate Thursdays
  • Reconstruction of a deposit slip from a single surviving corner
  • Rope loan for the cellar stair, returned by the depositor in person

Lost property

Items are held at the counter for one Standard year and then passed to the Head Office. Bring the ticket number.

ItemFoundTicket
Lead plumb bob engraved with a date eight years ahead of today3 OctLP-5481
Leather programme for a farewell recital, every page blank except the price16 SepLP-5160
Lamp glass sooted with the shape of a hand, pressed flat against it from the inside26 SepLP-9074
A bass drum skin, cut from the inside, with a pair of gloves tucked through the hole28 OctLP-5576

History

YearEvent
2403The branch opens.
2415A box of wet photographs arrived at Quay G from the Pallas Platform 8 flood, each one showing the same empty chair in a different light, and the staff have kept a chair in the same place in the lobby ever since.
2744A surveyor from the Ceres office reported that the Quay G hall had a second floor above its ceiling, and the staff have kept a ladder against the plaster ever since, in case a visitor wishes to check.
2831The board of Quay G declared a holiday for the day the first Belt courier came in, and the counter was kept open anyway by a teller who had not heard of it.
2838The Quay G annex stands on the foundation of an older cargo lock, whose inner doors still open for the staff at the start of every shift, though nobody has yet seen what lies behind them.

Notices

The bootscraper at the portico has been bolted back to its base with new bolts. The old bolts were found to have been set in the wrong stone, which has been left where it was, since it was not on the works order and nobody has been able to find the order.

Ref. CIBT-3029-A9C4-7