Branch
Quay B
The forecourt at Tempel Platform 6 was repaved in 2987 around a stone that the masons would not move, so the walk bends for it. The stone has since been named on the plan. Depositors who find they have walked round it without noticing are welcome to try it the other way.
The walls of the main hall are lined with the names of depositors who have closed their accounts. The names are cut small, and are read aloud, quietly, at the close of each shift. Nobody has been able to say whose voice does the reading.
Opening hours
| Counter | Local (shift) | Standard |
|---|---|---|
| Counter | 0.36 to 0.65 of the shift | 02:36:36 a shift |
| Memory Vault | 0.36 to 0.57 of the shift | 01:53:24 a shift |
| Automated Temporal Machines | Every shift | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Hollis Fothergill | Branch Manager | h.fothergill5946@bankoftime.net |
| Teodor Oyelaran | Claims Assessor | t.oyelaran5820@bankoftime.net |
| Kesi Kestrel | Chrono-Forex Dealer | k.kestrel8377@bankoftime.net |
| Elif Nakashima | Memory Vault Custodian | e.nakashima0428@bankoftime.net |
This month
- 4 November: Two holders who have not spoken since the reference clock was moved will share a bench at Quay B for the morning, under the eye of the oldest clerk on the floor.
- 10 November: The regulator in the Tempel Platform 6 annex, which has lost one minute on the first day of every month since it was installed, will be opened that morning so a clerk can watch the minute go.
- 12 November: A grey stone that has stood on the Quay B counter since spring will be carried to the strongroom on Thursday, and the staff will apologise to it in advance.
- 19 November: The Tempel Platform 6 brass band will play the Quay B new lift up its first ride, and the lift will carry the tuba before the cornets, as the lift's own inspector requires.
At this branch
- Mars Station branch rental of signed time-chits
- Interview room for callers the Bank cannot find on its map
- Temporary shutters for the north counter during the works, painted to match the plaster
Notices
Staff lunches are taken in the lower office until the canteen has been re-papered. Depositors who knock on the lower door during lunch will be told that the counter is closed, which is correct.
The tea urn will be off on the local shift of the holiday. Tea is still charged at the counter at the usual rate, in the usual seconds.
The north wall is being moved one brick to the left at the request of the neighbouring building, whose wall the scaffold has leaned on since 2987. The bricks will be laid back in their own order, and the neighbour has agreed to inspect each course before it is covered.
Ref. CIBT-3029-B843-1
