Montréal Sector23:09:02
Mars StationSol 410,894 13:26:34
The Belt2.81.69
Titan AnnexBeat 381.43
Corporate InstitutionalBank of Time0001
Depositors in an observation lounge watching a planet turn below

Locations & ATMs › Gate D, Encke Terrace 10

Branch

Gate D

Location
Encke Terrace 10
Branch code
5163
Opened
2853
Depositors in an observation lounge watching a planet turn below
Plate I Depositors in an observation lounge watching a planet turn below. From the Bank's archive.

The branch was enlarged in its fourth local year by knocking through the wall of the neighbouring hall. One side of the wall still has the old wallpaper, and the Bank keeps it for depositors who want to see what the room was for.

Shuttles at Gate D are bayed by weight, the lightest at the gate and the heaviest against the strongroom wall. The branch's engineers call this ballast, and the drivers call it the grudge.

Opening hours

CounterLocal (day)Standard
Counter0.33 to 0.62 of the day06:57:36 a day
Memory Vault0.33 to 0.54 of the day05:02:24 a day
Automated Temporal MachinesEvery dayAlways

Branch staff

NameRoleWrite to
Oren TranterBranch Managero.tranter2463@bankoftime.net
Quill Ellsworth-InglewoodBranch Managerq.ellsworthinglewood8577@bankoftime.net
Wim BellweatherATM Custodianw.bellweather4501@bankoftime.net
Tamsin Pemberton-HalloranPensions Officert.pembertonhalloran4523@bankoftime.net
Mateo SzaboATM Custodianm.szabo8879@bankoftime.net

At this branch

  • Interest review for balances held longer than one thousand years
  • Teller service in Standard Galactic Seconds and Earth minutes
  • Handing-in hatch for objects found on stairs and trams
  • Step-free access for pensioners, lift key kept at the counter
  • Brass hand-bell on loan for ceremonies of closure

The branch through the years

YearEvent
2853The branch opens.
2877The contractors building the Gate D lift ran out of rope in the spring, and the clerks lowered the first sacks of coin on a cord knotted at each sol until the rope arrived.
2883A lamp knocked over in the Gate D reading room burned one shelf of guild letters to the brass and spared the shelf beside it, and the custodians have never agreed which of the two they should regret.
2903A winter tide filled the Gate D vault to the height of its shelves, and the custodians, asked to save only what was worth saving, carried out the ledger of unpaid bills first.

Notices

The lift is being fitted with a new floor. Until it is down the lift will stop only at every second landing. Depositors for the others are asked to walk the last flight, which is marked by a brass number on the wall.

Blinds on the south windows will be drawn from the first hot day and raised again at the second bell. Depositors who prefer the light are asked to sit at the north desk, which is cooler and has no view of the street.

The lower hall was flooded from the north gutter on the last night of the rain, and its tiles have been lifted to dry. Depositors may use the gallery stair until the floor is back, and are asked to step only on the grey tiles, which were laid first and are the only ones the floor is sure of.

Ref. CIBT-3029-1907-5