Branch
Quay H
The building at Quay H was rebuilt in 2765 around its own counter, so the counter was never moved and never closed. The tellers describe the works as the longest unbroken transaction in the building's history, and nobody has come forward to dispute the description.
The night safe was the first service the branch offered and the last to be properly built. Its door shows the marks of many keys, and the custodian keeps a rubbing of each mark in a book by the lamp, so that anyone may see who has used the door and how many times.
Opening hours
| Counter | Local (day) | Standard |
|---|---|---|
| Counter | 0.35 to 0.64 of the day | 06:57:36 a day |
| Memory Vault | 0.35 to 0.56 of the day | 05:02:24 a day |
| Automated Temporal Machines | Every day | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Mara Delacroix-Mbeki | Branch Manager | m.delacroixmbeki4400@bankoftime.net |
| Ulla Jaramillo | Slippage Reconciliation Clerk | u.jaramillo4266@bankoftime.net |
| Soren Yardley | Claims Assessor | s.yardley6062@bankoftime.net |
| Teodor Oyelaran | Claims Assessor | t.oyelaran8854@bankoftime.net |
| Folke Bracegirdle | ATM Custodian | f.bracegirdle3504@bankoftime.net |
| Elif Valderrama | Deputy Branch Manager | e.valderrama7166@bankoftime.net |
Lost property
Items are held at the counter for one Standard year and then passed to the Head Office. Bring the ticket number.
| Item | Found | Ticket |
|---|---|---|
| Bicycle bell, nickel-plated, which rings once when a door opens and never otherwise | 5 Nov | LP-9688 |
| Oilcloth bag of brass keys, scorched at the bows, each tagged with a branch code that no longer exists | 5 Sep | LP-1677 |
| Tuba mouthpiece, cracked at the rim, wrapped in a ledger page marked Tallow Day | 11 Oct | LP-3828 |
| Pair of carpenter's knee pads, the straps knotted to a deposit slip | 2 Nov | LP-2382 |
| Visitor's sheet of woven silver, folded to the size of a stamp and tagged for the cloakroom, not the counter | 26 Sep | LP-3323 |
This month
- 4 November: A retired horologist will explain at Quay H why the lobby clock came back from its service with its hands in the wrong order, the mechanism working perfectly throughout.
- 6 November: A famous painter's sketchbook, held on account at Quay H as a fixed-term deposit, will be opened at its last page for holders to read, and the page is blank.
- 9 November: Floor tiles numbered for relaying will be laid out on the Swift Platform 12 forecourt on Saturday, so that holders can walk the Quay H lobby in the order it was first built.
History
| Year | Event |
|---|---|
| 2765 | The branch opens. |
| 2811 | A Venus cloudport swallow nested in the Quay H ventilation shaft during the rebuild, and was entered as a depositor for the season and paid in seed. |
| 2920 | The first Brymar College cohort placed at the Quay H was asked to re-sit the slippage examination on arrival. |
| 2938 | A fire in the Quay H record room burned the card index, and the staff rebuilt it from memory over one long winter, with depositors who knew their own numbers queuing at the grille. |
| 2971 | A delegation from the Varro Reach came to the Quay H with a ledger written in one sustained note, which the head clerk copied out by ear over a long winter. |
Notices
The side door is signed in both calendars and is the entrance for depositors who prefer the back of the building. The front steps are being scrubbed until the crew has gone home.
On the Day of the Shifted Bell the second bell rings first and the first bell rings after it. Depositors are asked to listen for the order rather than the number of strokes, which the custodian has been asked not to count.
Ref. CIBT-3029-00DC-7
