Montréal Sector20:07:04
Mars StationSol 410,894 10:29:28
The Belt9.47.46
Titan AnnexBeat 373.51
Corporate InstitutionalBank of Time0001
A city on the inside of a giant rotating ring, arching overhead

Locations & ATMs › Gate F, Huygens Outpost 12

Branch

Gate F

Location
Huygens Outpost 12
Branch code
6373
Opened
2871
A city on the inside of a giant rotating ring, arching overhead
Plate I A city on the inside of a giant rotating ring, arching overhead. From the Bank's archive.

A new teller at Huygens Outpost 12 is given an retired counter number and a card with the name left blank. They are asked to fill it in at the first close, in any hand they like, and the card is filed with the others. The branch has never yet found a name it could not spell.

The tenth bay has been kept empty since 2871 for a shuttle that was booked and did not come. It is still booked each local cycle in the yard book, and it is still free, which the staff regard as a service to shuttles that may yet arrive.

Opening hours

CounterLocal (cycle)Standard
Counter0.35 to 0.64 of the cycle12:10:48 a cycle
Memory Vault0.35 to 0.56 of the cycle08:49:12 a cycle
Automated Temporal MachinesEvery cycleAlways

Branch staff

NameRoleWrite to
Pax KowalczykBranch Managerp.kowalczyk7928@bankoftime.net
Esme KestrelHead Tellere.kestrel0720@bankoftime.net
Juno OkonkwoClaims Assessorj.okonkwo2076@bankoftime.net
Bram VantongerenBranch Managerb.vantongeren1777@bankoftime.net
Calla AchterbergSenior Accounts Officerc.achterberg7372@bankoftime.net
Soren PrendergastAccounts Officers.prendergast8429@bankoftime.net

At this branch

  • Refund of seconds lost in transit, on production of the courier's stub
  • Claims for attempted robberies, filed without a sum
  • Stool loan while the counter is being lowered
  • Repair of cracked glass counters, free to holders who cracked them
  • Pipe-band hire for the steps, with a clerk to count the bars
  • Written acknowledgement of a gift, signed by a clerk who did not receive it

This month

  • 1 November: The Gate F honours its longest-standing depositor with the head of the counter for one day, and the depositor is not asked to sign anything.
  • 8 November: On Hand-Over Day the Gate F changes its counter clerk every hour from opening to close, and depositors are asked to remember which clerk served them last.

Lost property

Items are held at the counter for one Standard year and then passed to the Head Office. Bring the ticket number.

ItemFoundTicket
Baby's pacifier on a ribbon, cleaned and labelled for return8 OctLP-5655
A stuffed bird under a glass dome, its label reading saw the robbery and will not testify16 SepLP-5793
Bandsman's cap with a marching route inked inside the peak, the route ending at a door the band has never used14 SepLP-6878
Empty bird cage with a card reading: for the visitor, who has gone home7 NovLP-7484
Three-fingered glove of pale grey hide, its fingers knotted together at the tips, and a note reading "they will want it back in the same shape"12 OctLP-5794

The branch through the years

YearEvent
2871The branch opens.
2923A Positive Contact family took the front row of the Gate F queue, and the rest of the queue, having nothing else to wait for, sat down on the steps and waited for them to finish.
2975The Huygens Outpost 12 lift operators sang out the floors in harmony for a whole afternoon, and the clerks of the Gate F, who had never heard the building so pleased with itself, forgot the day's sums.
3027The Huygens Outpost 12 vault hall closed for an afternoon when a Positive Contact depositor was found asleep in the queue, and the staff sat quietly beside it until it woke, which took the afternoon.

Notices

The night safe at Gate F is emptied at first light on the cycle after each collection. Envelopes posted after the last counter hour are dated by the local cycle in which they arrive, not the one in which they were written, and depositors are asked to bear this in mind when they seal them.

Bay four has a tree root under its paving, and the paving will lift by about a finger each cycle. Drivers who park there will be moved to bay five when the lift is marked. Bay four will be left empty for one cycle to see how the root behaves, and the yard hand has agreed to watch it from the gate.

The north wall of the upper office is being opened to find the flue of the old range, which the plans show as solid wall. The plans are being revised to match the wall, and the wall is being revised to match the plans, and the staff have asked to be told which is completed first.

Ref. CIBT-3029-FFA4-3