Branch
Mezzanine C

The masons who built the upper hall at Oort Outpost 11 left one stone uncut at the corner, the only uncut stone in the building. They said it was for the next mason. The Bank has not yet found the next mason, and the stone is looked over each watch for signs that it is being wanted.
The original plans for Oort Outpost 11 show a second strongroom under the yard. The Bank has no record of anyone digging it. The plans have been filed in the vault, next to the plans for a strongroom that was never drawn.
Opening hours
| Counter | Local (watch) | Standard |
|---|---|---|
| Counter | 0.34 to 0.63 of the watch | 02:19:12 a watch |
| Memory Vault | 0.34 to 0.55 of the watch | 01:40:48 a watch |
| Automated Temporal Machines | Every watch | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Soren Okonkwo | Branch Manager | s.okonkwo0102@bankoftime.net |
| Nadia Quigley | Chrono-Forex Dealer | n.quigley6985@bankoftime.net |
| Bex Mbatha | Branch Manager | b.mbatha2105@bankoftime.net |
| Fenna Northcott | Pensions Officer | f.northcott0132@bankoftime.net |
Lost property
Items are held at the counter for one Standard year and then passed to the Head Office. Bring the ticket number.
| Item | Found | Ticket |
|---|---|---|
| Brass-band part for second cornet, every bar marked rest in the same pencil hand | 3 Nov | LP-3143 |
| Child's crayon drawing of the branch with the lift on the outside wall, captioned "where Dad works" | 23 Sep | LP-7903 |
| Canvas satchel of letters addressed to depositors who have not yet opened accounts | 31 Oct | LP-6749 |
| Bandsman's cap with a marching route inked inside the peak, the route ending at a door the band has never used | 7 Nov | LP-5595 |
| A ledger swollen by the high water, legible only on the page for the third week of the flood | 4 Oct | LP-0694 |
| Garden fork with one tine bent back and a seed packet taped to the handle, marked for next spring | 26 Oct | LP-7503 |
Getting here
From the transfer dock, follow the green strip to the observation gallery and look down into the courtyard. Mezzanine C has the only roof on the square that faces the stars; enter from the lift bank on the west wall.
Notices
The tiles beside the strongroom door are being relaid in the pattern shown on the plan from 2977. The plan was drawn before the door was moved, so the tiles will run into the hinge. Depositors who hear an engine cooling in the yard from the strongroom may take it as the tiles being fitted.
The brass rail along the teller windows is being taken down for polishing, and a plain wooden rail will go up in its place. The wood is temporary. Depositors may lean on it, but are asked not to set their elbows where the brass plate used to be.
Counter hours for the watch are shortened by one local hour, owing to paper rustling in the air vent. Depositors who would have been served in that hour are asked to come back on the following watch, when the work will be done and the tellers rested.
Ref. CIBT-3029-3E5C-6