Branch
Gallery E
The strongroom was built against the chimney of an older house, and that house's hearth is still set into the north wall, with its iron fender. A clerk warms a cup there each cold season, against the rules, and the fender is polished before each change of rota.
Shuttle crews are not allowed to eat in the bay. They eat in the lower office, where the table is laid for the length of a meal and no longer, and the bay is cleared for the next shuttle before the plates are.
Opening hours
| Counter | Local (cycle) | Standard |
|---|---|---|
| Counter | 0.36 to 0.65 of the cycle | 12:10:48 a cycle |
| Memory Vault | 0.36 to 0.57 of the cycle | 08:49:12 a cycle |
| Automated Temporal Machines | Every cycle | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Quill Prendergast | Branch Manager | q.prendergast0488@bankoftime.net |
| Kesi Sorensen-Vey | Deputy Branch Manager | k.sorensenvey0746@bankoftime.net |
| Rhea Juvonen-Abernethy | Compliance Officer | r.juvonenabernethy4568@bankoftime.net |
| Xan Kestrel | Event II Liaison | x.kestrel5670@bankoftime.net |
Lost property
Items are held at the counter for one Standard year and then passed to the Head Office. Bring the ticket number.
| Item | Found | Ticket |
|---|---|---|
| Sealed hourglass, the sand still running, found beside platform four | 13 Nov | LP-2915 |
| Oilcloth bag of brass keys, scorched at the bows, each tagged with a branch code that no longer exists | 31 Oct | LP-2835 |
| Parade programme for a festival no one has declared, the route traced in red ink that has faded since the morning it was printed | 24 Oct | LP-5294 |
| Ferry ticket for a holiday crossing that sailed without its passengers, the stub still warm | 9 Oct | LP-3342 |
| Autograph book of a famous depositor, the last page blank and a second signature glued in beside the first in the same ink | 26 Sep | LP-3586 |
| Plaster bust of a Governor's left ear, found in the cellar and claimed by no head since | 3 Sep | LP-1056 |
Getting here
Follow the arcade past the pawnbroker whose window clock stopped during the attempted break-in on Tanner's Row. Gallery E is the brass door beside it, the one the thieves walked past.
Notices
The upper hall floor will be re-tiled from the west wall during the next cycle. Please use the middle door while the tiles are set, and do not step on the wet patches, which are glue and not a leak.
The second-floor washroom is being retiled in a green that the contractor calls restful. The work will take one local cycle, though the contractor has described other jobs as restful and left them open for two.
Ref. CIBT-3029-36A0-4
