Branch
Exchange H
The main hall of the building at Pallas Outpost 4 has no windows on the street side. Light comes down a single shaft from the roof, and the tellers read the local hour from the patch it makes on the floor. The lintel above the portico has carried the date 2526 since the building was raised.
The stone of the portico is laid with its grain running towards the road, so the rain drains off the steps into the gutter of the next building. The Bank has been asked to correct this and has reviewed the drain.
Opening hours
| Counter | Local (cycle) | Standard |
|---|---|---|
| Counter | 0.37 to 0.66 of the cycle | 12:10:48 a cycle |
| Memory Vault | 0.37 to 0.58 of the cycle | 08:49:12 a cycle |
| Automated Temporal Machines | Every cycle | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Calla Fennimore-Rasmussen | Branch Manager | c.fennimorerasmussen4178@bankoftime.net |
| Uma Bracegirdle | Compliance Officer | u.bracegirdle4945@bankoftime.net |
| Leda Delacroix-Mbeki | Compliance Officer | l.delacroixmbeki7154@bankoftime.net |
This month
- 4 November: The Exchange H counter brass is polished for the first time since the works began, and visitors are asked to admire it from behind the rope.
- 11 November: Ferry Holiday brings the Pallas Outpost 4 flag down the Exchange H pole at noon, and the staff fold it in the usual way, counting the folds aloud.
- 13 November: On the Balance Fair the Exchange H vestibule shows a case of donated pocket watches, each wound to the hour its donor walked in, and the donors' grandchildren are asked to explain the choice.
- 18 November: An unlabelled cedar chest brought to Exchange H by a ferry crew will be opened on Quarter Day, with the crew asked to stand well back from the lid.
Getting here
Use the pedestrian tunnel under the square and follow the tiled arrows until they stop. The bank is wherever you happen to be standing when they stop.
The hoardings outside Exchange H are painted with a picture of the finished building. The work was completed in the spring, and the picture is still there, with a small cone of scaffolding in the corner that nobody has been able to explain.
From the visitors' book, A. A., Delhi Sector
Services
- Lost-deposit tracing, claims filed within one orbit
- Pulley hire for lifting stone, returned without the stone
- Certificate that a robbery did not take place, issued in duplicate for the thief's records
- Ladder loan for holders who wish to read the old date stone
Notices
The front steps are being relaid during the local cycles when nobody is using them. Work stops at the first counter hour and resumes after the last, and the steps are never left unfinished overnight.
The yard tap has been shut for the cold snap. Depositors who want water should ask the staff, who will bring a cup from the lower office and not from the stair.
The lift to the third floor will stop only at the even floors from the first cycle of next month, while its brake is recut. Business for the odd floors may be done on the second, where the same tellers are seated at the same windows.
Ref. CIBT-3029-E276-4
