Branch
Spur G

The cellar wall at Encke Yard 6 has one brick fewer than the plan filed with the Bank in 2468. Nobody on the staff can say whether the brick was taken out, and the wall has held either way.
Shuttles from the upper rail spur park on the second deck, which was built to hold them for one watch and has held them since 2468. Its load rating is painted on the ramp rail in both sets of units.
Opening hours
| Counter | Local (watch) | Standard |
|---|---|---|
| Counter | 0.34 to 0.63 of the watch | 02:19:12 a watch |
| Memory Vault | 0.34 to 0.55 of the watch | 01:40:48 a watch |
| Automated Temporal Machines | Every watch | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Sunniva Abernethy | Branch Manager | s.abernethy0486@bankoftime.net |
| Wim Fothergill | Event II Liaison | w.fothergill2686@bankoftime.net |
| Priya Sorensen-Vey | Pensions Officer | p.sorensenvey7808@bankoftime.net |
| Jarrah Fennimore | Chrono-Forex Dealer | j.fennimore2255@bankoftime.net |
| Nils Halloran | Pensions Officer | n.halloran5652@bankoftime.net |
Lost property
Items are held at the counter for one Standard year and then passed to the Head Office. Bring the ticket number.
| Item | Found | Ticket |
|---|---|---|
| Hard hat stencilled with a completion date in the next century | 22 Oct | LP-9360 |
| Feather boa in holiday green, one feather added for every year the Bank has been open, the count one short | 18 Sep | LP-6653 |
| Stethoscope cut in two at the tubing, one half still listening to the strongroom door | 11 Oct | LP-2078 |
| Umbrella with a Ceres dock label, dry at the tip and wet along the handle | 7 Nov | LP-9206 |
| Lacquered fan of a trading ring, its map showing the Bank in one corner with a question mark where the seal should be | 23 Oct | LP-6766 |
| A jemmy with its handle still warm, found beside the strongroom door and not claimed | 4 Sep | LP-5737 |
This month
- 2 November: A balloon courier from Encke Yard 6 will land on the Spur G roof at noon, climb down the ladder in full kit, and be kept waiting at the ground floor while the lift is repaired.
- 8 November: A pastry cook from Encke Yard 6 who stopped a cellar break-in with a tray of hot buns will be thanked at the counter on Monday, and the buns will be served to the whole queue on the house.
- 14 November: The Positive Contact liaison officer at Spur G takes questions on the Sunday, in the local script, and answers them in the order received, which has slowed the queue considerably.
What we offer here
- Renovation waiting list, names taken in the order the stonework arrives
- Lamp-lighting for holders who arrive after dark by any clock
- Certificate for a deposit that cannot be found, signed by two tellers
Notices
The yard wall at Encke Yard 6 is being repointed in the old mortar. The masons mixed it from yard dust by a recipe they will not write down, and the wall will look as it did before. The recipe has been filed as a deposit of dust, in the Bank's own name.
The wall clock case has been moved from the lobby to the strongroom, leaving a pale rectangle on the plaster where it hung. Depositors may judge the size of the clock from that shape, which is the size it was when new. The clock will return within one watch, or as soon as the rehousing is agreed.
Thistledown from the yard tree will drift through the vents for the rest of the warm season. It settles on the ledgers and in the counter cloth, and it is not to be signed for. Depositors who find a seed on their papers may keep it, provided they do not try to deposit it.
Ref. CIBT-3029-7004-9