Montréal Sector19:12:23
Mars StationSol 410,894 09:36:15
The Belt8.47.03
Titan AnnexBeat 371.12
Corporate InstitutionalBank of Time0001
A teller window beside an airlock, a planet sliding past the porthole

Locations & ATMs › Mezzanine B, Pallas Terrace 8

Branch

Mezzanine B

Location
Pallas Terrace 8
Branch code
7745
Opened
2487
A teller window beside an airlock, a planet sliding past the porthole
Plate I A teller window beside an airlock, a planet sliding past the porthole. From the Bank's archive.

Scaffolding has stood on one side or another of the building at Pallas Terrace 8 since 2487. It comes down at the end of each local watch and goes up again at the start of the next, so the building is never quite finished and never quite ready to be looked at.

A teller's name is cut into the jamb of the lower office door, with the day that teller stopped coming in. The teller left without notice. The staff keep a pencil on the sill so the spelling can be corrected by anybody who knows it, and the pencil is replaced each season without ever having been used.

Opening hours

CounterLocal (watch)Standard
Counter0.36 to 0.65 of the watch02:19:12 a watch
Memory Vault0.36 to 0.57 of the watch01:40:48 a watch
Automated Temporal MachinesEvery watchAlways

Branch staff

NameRoleWrite to
Kofi Drummond-LarkspurBranch Managerk.drummondlarkspur3094@bankoftime.net
Rafe DrummondSenior Accounts Officerr.drummond4021@bankoftime.net
Faro OyelaranSlippage Reconciliation Clerkf.oyelaran9907@bankoftime.net
Vesna LindqvistEvent II Liaisonv.lindqvist5219@bankoftime.net
Ulla AshgroveATM Custodianu.ashgrove9877@bankoftime.net

Lost property

Items are held at the counter for one Standard year and then passed to the Head Office. Bring the ticket number.

ItemFoundTicket
Lock-pick set rolled inside the score of a bassoon concerto, every pick bent back on itself28 OctLP-8298
Tin of brass tacks sorted by head size, labelled "for the notice board, spring"19 OctLP-9957
Positive Contact drinking glass half full of something that is not water, labelled for the duty teller17 OctLP-0294

From the branch register

YearEvent
2487The branch opens.
2648A Belt miner who came to Mezzanine B to lodge a complaint stayed three years to see whether it would be answered, and it was answered on his last afternoon, in writing, with a copy for the file.
2666The custodian at Pallas Terrace 8 reported a shadow crossing the vault every night for a month without setting off the alarm, and the logs for those nights have been filed and never explained.
2831A Titan clerk transposed two figures in a transfer to Pallas Terrace 8, and the error was carried through eleven audits before anyone noticed the depositor had been paying the Bank.
2933A widow from Pallas Terrace 8 gave the Mezzanine B the seconds her husband had left unspent in his will, with one request, that the clerks use an afternoon sitting down.
3010The Mezzanine B checked every coin against the phase of the nearest moon for a decade, a practice the Authority ratified by mistake and has since been too embarrassed to rescind.

Notices

The iron grilles on the teller windows are being taken down because of the ferry was held at the lock for a full Standard day, and plain glass is going up in their place. The change is cosmetic. Depositors are asked to look for the open window by its number, which has not changed.

The fire buckets along the stair are being refilled from the yard tap. It is the same water as before. The Bank has been asked where it came from and has replied that it came from the yard, where the buckets are kept.

Ref. CIBT-3029-1535-2