Branch
Quay E
A clock tower at Kuiper Outpost 1 has no clock in it. The Bank's position is that the tower keeps whatever time it is given, and the time it is given comes from the counter, which is more reliable than most towers.
A line painted across the lot at Kuiper Outpost 1 marks the point where the weather is held to begin. Shuttles parked beyond it pay the storm rate. On the morning of each rain the yard hand walks the line with a folding rule to confirm it has not moved, and it has not. The rule has been replaced twice.
Opening hours
| Counter | Local (cycle) | Standard |
|---|---|---|
| Counter | 0.36 to 0.65 of the cycle | 12:10:48 a cycle |
| Memory Vault | 0.36 to 0.57 of the cycle | 08:49:12 a cycle |
| Automated Temporal Machines | Every cycle | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Nadia Hightower | Branch Manager | n.hightower8638@bankoftime.net |
| Uma Tranter-Thistlewood | Memory Vault Custodian | u.tranterthistlewood3840@bankoftime.net |
| Hamid Quigley | Claims Assessor | h.quigley5390@bankoftime.net |
| Hamid Prendergast | Memory Vault Custodian | h.prendergast7100@bankoftime.net |
| Ama Bracegirdle | Compliance Officer | a.bracegirdle7474@bankoftime.net |
Lost property
Items are held at the counter for one Standard year and then passed to the Head Office. Bring the ticket number.
| Item | Found | Ticket |
|---|---|---|
| Clear jar of hard grey dust labelled Visitor's sample, do not stir, its lid bulging faintly as if it breathed | 27 Sep | LP-1691 |
| Plasterer's trowel with a dried cement handprint on the blade, the hand a child's and the print dated before the wall was built | 10 Oct | LP-2881 |
| Coil of surveyor's chain with one link stamped SECOND and the rest left unmarked | 13 Oct | LP-3096 |
Services
- Ledger reconciliation for Positive Contact accounts
- Holiday-week counter, staffed by volunteers from accounts
- Roof survey of the branch by appointment, weather permitting
- Lobby flowers donated by a Ceres greenhouse, changed weekly
- Re-timing of a clock found running on another holder's time
Notices
The third bay of the portico is being rebuilt stone by stone in the order it was first laid. The bay is hoarded for the length of the job, and depositors may come in through the arch while it stands.
Ref. CIBT-3029-DFC9-8
