Montréal Sector19:12:13
Mars StationSol 410,894 09:36:05
The Belt8.46.72
Titan AnnexBeat 371.12
Corporate InstitutionalBank of Time0001
Station promenade bank at closing time, shutters half down

Locations & ATMs › Mezzanine H, Oort Spindle 4

Branch

Mezzanine H

Location
Oort Spindle 4
Branch code
8569
Opened
2564
Station promenade bank at closing time, shutters half down
Plate I Station promenade bank at closing time, shutters half down. From the Bank's archive.

A local day at Oort Spindle 4 begins at a different Standard second every day, and the branch has kept a table of the differences since 2564. The table is long, and the tellers consult it at the window more often than the board, which they say is the more honest of the two.

Depositors who ask the local hour at Oort Spindle 4 are shown the portico sundial first, then the board, then a card with a sum on it. The sum has been checked twice and comes out to the same hour each time.

Opening hours

CounterLocal (day)Standard
Counter0.35 to 0.64 of the day06:57:36 a day
Memory Vault0.35 to 0.56 of the day05:02:24 a day
Automated Temporal MachinesEvery dayAlways

Branch staff

NameRoleWrite to
Cleo NorthcottBranch Managerc.northcott1392@bankoftime.net
Leda Juvonen-YardleyBranch Managerl.juvonenyardley9489@bankoftime.net
Quill Eversley-ThistlewoodSenior Accounts Officerq.eversleythistlewood3211@bankoftime.net

This month

  • 3 November: A roll of jubilee bunting left over from the Mezzanine H's golden year will be hung across the counter for one day, and each clerk will be asked to count the faded flags.
  • 8 November: On Quarter Holiday the Mezzanine H closes early so its clerks may watch the Oort Spindle 4 rockets from the roof, and the custodian will count them aloud.

Getting here

A tram stops at Oort Spindle 4 Gate for a quarter of an hour and nowhere else. Walk along the arcade to Mezzanine H, under the plate with the crooked engraving.

Notices

The yard hand will walk each arriving shuttle to its bay on foot from the next day, at the pace of the shuttle. Drivers who wish to take the last length themselves should say so at the gate, and the yard hand will walk a little ahead to show the way.

The tiles beside the strongroom door are being relaid in the pattern shown on the plan from 2564. The plan was drawn before the door was moved, so the new tiles will run into the hinge. Depositors who hear the scrape of a bench being moved from the strongroom may hear it as the tiles being fitted.

Ref. CIBT-3029-0750-0