Branch
Spur B
The yard at Huygens Relay 10 has a second gate for the carts, painted red, which opens onto the back lane. Shuttles are not permitted in the back lane, which is narrower than they are and was never measured for them.
The roof was finished in 2714, then taken down and rebuilt on the same beams, because the first roof had been laid a metre too high for the building. The surveyor certified the second as a true copy of the first.
Opening hours
| Counter | Local (day) | Standard |
|---|---|---|
| Counter | 0.37 to 0.66 of the day | 06:57:36 a day |
| Memory Vault | 0.37 to 0.58 of the day | 05:02:24 a day |
| Automated Temporal Machines | Every day | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Priya Nakashima | Branch Manager | p.nakashima7601@bankoftime.net |
| Uma Northcott | Memory Vault Custodian | u.northcott7123@bankoftime.net |
| Nadia Thistlewood | Senior Accounts Officer | n.thistlewood5254@bankoftime.net |
| Bram Tranter | Pensions Officer | b.tranter2537@bankoftime.net |
| Lumi Yardley-Fothergill | Customer Relations | l.yardleyfothergill3567@bankoftime.net |
What we offer here
- Lyric Licensing Desk, verses registered on Tuesdays
- Resetting of pocket watches that have run backwards overnight, one watch per visitor
- Relocation of a counter to a new floor, brass fittings included
This month
- 2 November: The Lyric Licensing Desk at Spur B will hold an open surgery for poets who wish to register a verse before entering a heat.
- 8 November: Members may see the tuning fork the Spur B choir left in the strongroom, displayed under glass in the reading room for the first time since it was found.
- 12 November: The Spur B north hall reopens after eleven months of works, and the ribbon will be cut by the plasterer from Huygens Relay 10 rather than the manager, who has asked to watch.
- 20 November: A donor who lodged a bronze hand with Spur B asks that it be given to the first holder to take it, and the custodian will stand beside the counter to witness the handshake on the hand's behalf.
Notices
The first warm day of the season is entered in the same ledger as the last cold one, in the same hand. Please do not ask which is the more important.
The strongroom will not take a potted fern in a paper bag until the rail has been cleared, which will be the day after next at the earliest. Depositors may leave it at the day counter in the meantime, where a teller will sign for it and hold it until the close.
Ref. CIBT-3029-E0F5-6
