Montréal Sector19:23:49
Mars StationSol 410,894 09:47:23
The Belt8.68.03
Titan AnnexBeat 371.62
Corporate InstitutionalBank of Time0001
A space elevator's base station, a cable rising into the clouds

Locations & ATMs › Gate D, Pallas Platform 6

Branch

Gate D

Location
Pallas Platform 6
Branch code
9868
Opened
2617
A space elevator's base station, a cable rising into the clouds
Plate I A space elevator's base station, a cable rising into the clouds. From the Bank's archive.

In the colder months the heating is kept at the level the Head Office approved in 2617. The staff describe it as adequate and the depositors describe it as optimistic.

The staff at Gate D choose their own tellers, and they choose for steadiness. A new teller is tested by counting coins in the dark, and the branch has so far not needed to fail anyone.

Opening hours

CounterLocal (cycle)Standard
Counter0.35 to 0.64 of the cycle12:10:48 a cycle
Memory Vault0.35 to 0.56 of the cycle08:49:12 a cycle
Automated Temporal MachinesEvery cycleAlways

Branch staff

NameRoleWrite to
Greta NakashimaBranch Managerg.nakashima2050@bankoftime.net
Tamsin Ishikawa-BlueBranch Managert.ishikawablue5741@bankoftime.net
Kofi Marchetti-BlackwoodAccounts Officerk.marchettiblackwood8180@bankoftime.net

Lost property

Items are held at the counter for one Standard year and then passed to the Head Office. Bring the ticket number.

ItemFoundTicket
Cufflinks shaped as small hourglasses, one with no sand in it9 SepLP-3548
Alarm clock with both bells dented, set to 11:59 and never reset6 OctLP-2782
Scorched ledger spine, its title stamped in a script with no vowels3 SepLP-9700
A ceramic spaniel with a deposit slip folded into its collar, the slip signed in pencil, the dog unclaimed23 SepLP-3882

From the branch register

YearEvent
2617The branch opens.
2673The Pallas Platform 6 branch was ledgered for a full week under a name that matched no account, and the auditors, having no grounds to object, wrote the week off as a loss.
2694The strongroom clock at Pallas Platform 6 was found in its fifth decade to be keeping the time of a Moon city the board had no record of, and it was left running, its hours entered as received.
2703The roof of Gate D burned in the summer, and the custodians carried out the ledgers and left the vault until last, being sure it would not burn. It did not, and it is still the only room the staff trust.
2725Pallas Platform 6 began accepting deposits in the local dialect of time, which Head Office translated into SGS for the monthly return.
2850Someone pinned a square of grey felt to the Gate D ledger shelf each morning for a winter, always with the same stitch, and the custodian who removed it found the next one already in place.
3009A slippage dispute between the Gate D and the Pallas Platform 6 relay ran for eleven years before either clock was agreed to be wrong.

This month

  • 1 November: A short film about the Head Office lift shafts will be shown at Gate D, followed by a discussion of the lift's fee schedule.
  • 7 November: A two-hour workshop on calibrating wristwatches against the Pallas Platform 6 reference will supply a loaner clock to each attendee.
  • 13 November: On Quarter Day the Gate D staff walk the roof of the Pallas Platform 6 annex with a surveyor's chain, and the public may follow at a distance.

What we offer here

  • Currency conversion for Venus Cloudport holders, daylight hours
  • Brass hand-bell on loan for ceremonies of closure
  • Night watch with a bell, for holders who wish to sit up with their balances
  • Fire-blanket hire for holders' ledgers, returned scorched
  • Holder's clock stopped for one minute at the holder's request, restarted by the custodian
  • Signature card of a famous depositor, shown under glass

Notices

Tellers who wish to change windows for a local cycle must agree it with the teller at the other window and not with the rota. The rota has been informed. It has asked for a copy of the agreement and will be sent one once the swap is over.

Ref. CIBT-3029-415A-5