Branch
Mezzanine D
The branch marks the local feast of the first ledger by reading out the opening balance at the counter, in the voice of the first teller, from a card that has not been seen since 2623.
A local watch at Swift Relay 11 is 28,800 Standard seconds long, and the branch divides it into eleven counter hours, not twelve, because the twelfth was never built. The board leaves a blank where it would be, and depositors are free to fill it with whatever they carry in their heads.
Opening hours
| Counter | Local (watch) | Standard |
|---|---|---|
| Counter | 0.35 to 0.64 of the watch | 02:19:12 a watch |
| Memory Vault | 0.35 to 0.56 of the watch | 01:40:48 a watch |
| Automated Temporal Machines | Every watch | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Hollis Kowalczyk | Branch Manager | h.kowalczyk0622@bankoftime.net |
| Juno Quaresma | Claims Assessor | j.quaresma3677@bankoftime.net |
| Leda Fairbrass | Senior Accounts Officer | l.fairbrass2434@bankoftime.net |
| Nadia Yardley | Branch Manager | n.yardley6372@bankoftime.net |
| Oren Oyelaran | Slippage Reconciliation Clerk | o.oyelaran7226@bankoftime.net |
| Bex Jaramillo-Rasmussen | Senior Accounts Officer | b.jaramillorasmussen0652@bankoftime.net |
The band that closed the festival ended on a single note that hung in the marble until closing, and nobody at Mezzanine D would ask it to stop.
From the visitors' book, J. D., Kepler Ring
History
| Year | Event |
|---|---|
| 2623 | The branch opens. |
| 2654 | When the Mezzanine D reference clock was carried across the lobby it lost four minutes on the journey and never recovered them, and the teller who carried it is still waiting, with a receipt, for the minutes to be credited to her. |
| 2736 | Crowds from three ferries filled the Mezzanine D steps on the first holiday of the Lagrange crossing, and the tellers counted them in as deposits, one second each, which the board minuted as a run on the bank. |
| 2842 | A spark from a passing railcar set the Swift Relay 11 shutters alight, and the custodian's log records a sweet smell that he entered as the old varnish, which it was not. |
This month
- 3 November: A children's workshop at Mezzanine D teaches the folding of paper lanterns; the first pupil of each session is asked to keep the one lantern with a number inside it that no one recognises.
- 9 November: A rope left hanging from the Mezzanine D skylight after a failed descent will be cut down on Thursday and entered as a fixture, its knot to be untied by the thief, who has been invited.
- 14 November: On Midsummer Balance the Mezzanine D staff carry their cash in baskets along the Swift Relay 11 waterfront, paying each holder they meet on the way, and the counter stays shut until the last basket is empty.
Services
- Certified copies of birth-second entries
- Fire-door testing on the first Monday of each month
- Holiday lamp-trimming for the vestibule, done by the eldest holder present
- Stools in three heights, for visitors from heavier and lighter worlds
- Sheet music copied for choirs of up to twelve voices, while you wait at the grille
- Pipe-band hire for the steps, with a clerk to count the bars
Notices
The reversing ramp at the south end of the lot will be one-way from the watch after next. Shuttles going in will climb the ramp and leave by the lane; those coming out may not pass them on the ramp, whatever the hurry.
A late heat has come in on the watch after the thaw. Windows will be open from the first hour and the blinds down until the second. Depositors who want the cool side may stand by the north pillar, which does not sweat.
A teller covering a window for a colleague should speak the colleague's name at the glass for the length of the cover, and not their own. The name is written on a card by the till, and the card is to be read before each transaction. The cover is not complete until the depositor has repeated the name back.
Ref. CIBT-3029-6901-4
