Branch
Hall E
Each year the bunting is taken down in the cold season and folded into the strongroom, where it is counted and listed. The list has grown every year since 2646, and nobody has been able to say what has been added to it.
Each local rotation at Vesta Station 5 is 97,200 Standard seconds long, but the branch divides it into twelve hours which are not equal, by a rule older than the counter. The shortest is the hour before the first bell, and the longest is the hour the tellers take for their dinner.
Opening hours
| Counter | Local (rotation) | Standard |
|---|---|---|
| Counter | 0.33 to 0.62 of the rotation | 07:49:47 a rotation |
| Memory Vault | 0.33 to 0.54 of the rotation | 05:40:12 a rotation |
| Automated Temporal Machines | Every rotation | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Dario Juvonen | Branch Manager | d.juvonen1757@bankoftime.net |
| Uma Oyelaran-Fairbrass | Branch Manager | u.oyelaranfairbrass9584@bankoftime.net |
| Lumi Rasmussen | ATM Custodian | l.rasmussen6454@bankoftime.net |
| Juno Eskeland | Memory Vault Custodian | j.eskeland9228@bankoftime.net |
| Yara Underhill | Accounts Officer | y.underhill3843@bankoftime.net |
Services
- Dealer's counter, opening only after the local sol has dawned
- Donated objects displayed in the lobby cabinet for one month
- Fire-blanket hire for holders' ledgers, returned scorched
- Acknowledgement of an unexplained deposit, issued without a name
- Lanterns lent to holders walking home after a flood curfew, returned on the first dry morning
- Notary on the portico for sworn statements about time served
From the branch register
| Year | Event |
|---|---|
| 2646 | The branch opens. |
| 2677 | After a clerk fainted across the ledger at Hall E, the figures were found to have been totalled correctly in a hand that no member of staff could match. |
| 2850 | A holdup note handed to the teller at Vesta Station 5 asked for three hundred hours in cash, and was returned with a request for a signature, which the robber gave. |
| 2859 | A cinder from the Vesta Station 5 forge drifted into the ledger room and smouldered through a whole audit before a clerk noticed the smell on page nine. |
| 2996 | A Positive Contact diplomat lodged a sealed promise at Hall E in the first week, and the promise was honoured in full, though no one in the building has ever been shown what it said. |
Notices
Staff lunches are taken in the lower office until the canteen has been re-papered. Depositors who knock on the lower door during lunch will be told that the counter is closed, which is correct.
The night safe is closed for inspection of its lamp on the rotation. Envelopes may still go in the slot. They will be dated to the first lamp after the inspection, and the custodian asks that nothing be pushed in harder because the lamp is out.
The second-floor landing is propped while its ceiling is seen to. Depositors for the second floor should take the back stair, which is wider and has been checked by a man with a plumb line.
Ref. CIBT-3029-AB0D-3
