Montréal Sector03:56:02
Mars StationSol 410,894 18:05:53
The Belt8.08.82
Titan AnnexBeat 393.93
Corporate InstitutionalBank of Time0001
A hushed counting room, clerks stacking tiny sealed hourglasses into racks

Terms & Conditions › Decade Certificate › Edition 2827.2

Terms and Conditions

Decade Certificate

Edition
2827.2
In force from
1 August 2827
Supersedes
2827.1
Superseded by
2828.1

These terms apply to every Decade Certificate held with Corporate Institutional Bank of Time ("the Bank") at any branch, on any world.

  1. 1.2

    No mixed entries.

    A single line in a ledger carries one unit only. An entry that combines Standard seconds and a local unit is void, and the Bank will restate it in Standard seconds at the rate in force on the day it was made.

  2. 2.1

    Disputed start.

    Where the start of a term is disputed, the Bank shall produce the Standard clock record for that second and shall not rely on a local record alone.

  3. 3.2

    Withdrawals.

    Interest on a sum withdrawn during a month stops at the second it leaves the account. It is not paid on that sum for the rest of the month.

  4. 4.2

    A minor's certificate.

    A certificate held for a minor may be redeemed early only by the guardian named in the deed. Any forfeit is taken from the minor's share of the interest, not from the guardian's.

  5. 5.1

    Late in the post.

    A notice of non-renewal posted in good time but delayed on the way counts as received on the day it was posted, provided the envelope is produced with its postmark.

  6. 6.1

    Postage.

    A statement sent to an address outside the district of the home branch carries a postage charge of one Standard second, deducted from the balance at issue, in addition to any other charge in the schedule.

  7. 7.1

    Lodging a dispute.

    A dispute under this clause must be made in writing and must reach the home branch within ninety Standard days of the transaction disputed. A dispute that arrives later is considered at the Bank's discretion, and the reply will say why it was or was not considered.

Doc. ref. CIBT-2827-AFFF-6